Project History

  • Fig. 1. 50' Support Tower c/w Antenna50' Support Tower c/w Antenna
  • Fig. 2. Construction of Reflector Support TowerConstruction of Reflector Support Tower
  • Fig. 3. Support Tower c/w Microflect Passive ReflectorSupport Tower c/w Microflect Passive Reflector

Telecommunication Installations


Client Project Description of Work

BC Hydro & Power Authority
Mica-Kootenay Microwave System

Sludge Press Building

  • Installation of digital microwave radios, synchronous multiplexers, synchronizers, asynchronous multiplexers (DACS), miscellaneous VF racks, fiber optic terminals, AC distribution panels, battery charger racks and battery bank, and the removal of replaced equipment.

BC Hydro ∓ Power Authority
Pemberton, BC

Contract QO2574
Design, supply & installation of Microwave tower and Antenna system.

  • Design, supply & installation of antennas, feedhorns, waveguides & dehydrators/pressurization system including the supply of waveguides and associated accessories for the Creekside, Black Tusk microwave system. All work done on a hot system. Also included were:
    • 20ft. X 24ft. Passive Reflector
    • Structural reinforcement of existing guyed tower.
    • Free standing 50ft tower.


Microwave Radio Equipment

  • Installation of digital microwave radio equipment at 44 stations throughout southern BC.

Towers

  • Structural bracing of existing microwave tower.
  • Construction of 50 ft. support tower and installation of antenna.
  • Erection of free standing support structure, anchoring and arctic type microflect 20ft. X 24ft. passive reflector.