Ladore & Strathcona Dam's Spillway Gates Refurbishment

Ladore & Strathcona Dam's Spillway Gates Refurbishment

BC HYDRO - CAMPBELL RIVER, BC

Installation of Mechanical and Electrical Upgrades of Spillway Gates, which included:

  • Design / build all new control systems
  • Design / build new standby generator sets and associated civil works and duct banks.
  • Supply and installation of a 100 foot bridge to access the Dam structure with a 165 Ton Conventional crane.
  • Carry out site restoration in a critical path environmental atmosphere.
  • Remove / refurbish existing capstan drives and associated mechanical components.
  • Upgrade existing diesel generator to existing code requirements.
  • All new components were installed to the latest seismic standards

Peak Manpower on Site - 40