Design, Supply and Install of Spillway Gates and Hoists.
(Click image for details)
Supply and install one inert gas enclosure for transformer T3.
(Click image for details)
Design, Supply & Erection of four 31 meter diameter by 15 meter high Storage Tanks.
(Click image for details)
Expansion of 230kV yard and substation including installation of 450MVA Phase Shift transformer.
(Click image for details)
Supplied structural steel, 6 metal buildings and all electrical and instrumentation for a Liquid Natural Gas Plant.
(Click image for details)
Civil and electrical construction of 500kV capacitor banks and associated equipment including SCADA system. (Click image for details)
Removal and upgrade of GMS Station Service equipment.
(Click image for details)
Construction of two-11 megawatt (MW) run-of-river projects on the Upper and Lower Clowhom River.
(Click image for details)
Installation of mechanical and electrical equipment supplied by BC Hydro and others.
(Click image for details)
Civil, electrical, protection and control (P&C) Work required for 230 kV circuit breaker replacements and 230 kV surge arrester additions at Cranbrook Substation.
(Click image for details)
Design, supply and install base structures and foundations to support the antennae systems.
(Click image for details)
Construction of Site preparation, Telecom and Radio Tower.
(Click image for details)
Installation of mechanical and electrical upgrades of Spillway Gates. (Click image for details)
Terminal conversion and installation of high voltage power distribution system, electrical, data and telephone system. (Click image for details)
Haney Substation - Maple Ridge, BC
Harvie Road Substation - Surrey, BC
Function Junction Substation - Whistler, BC
Fox Creek Substation - Fort St. John
Mount Lehman Substation - Abbotsford, BC
(Click image for details)
Installation of 32 km of 25KV Direct Burial Cabling. (Click image for details)
This undertaking was an all-inclusive project from the civil through to the architectural finish.
(Click image for details)
Knock down c/s tank erection to API 650 of: 2 tanks - 50ft.(H) ; 7 tanks - 40ft.(H) ; 1 tank - 12ft.(H) (Click image for details)
Replacement and upgrading of millwright, electrical, and instrumentation; modification of pipe fitters. (Click image for details)
Systematic change out of six Co-generation engines and generators, installation of entire 5KV Electrical Distribution System, and upgrade of all Gas and Heat Recovery Piping Systems.
(Click image for details)
Installation of High Pressure Steam Heaters and Burner Management System; Hydrogen Piping System Replacement; Boiler Superstructure Seismic Upgrade; Replacement of HMI Data System. (Click image for details)
Work at this site consisted of the installation of process equipment and design of associated piping, electrical and instrumentation systems. (Click image for details)
Supply and steel erection of six transfer towers and gallery sections for five conveyors. Extensions and modifications to the existing galleries.
(Click image for details)